GS 400 V8-4.0L (1UZ-FE) (1999)
Step 1
Step 2
Step 3
INSPECTION PROCEDURE
HINT: In case of using the LEXUS hand-held tester start the inspection from step 1 and incase of not using the LEXUS hand-held tester start from step
2.
Power Source Circuit
CIRCUIT DESCRIPTION
This circuit provides power to operate the body No.2 ECU.