GS 460 V8-4.6L (1UR-FSE) (2008)
(e) Remove the nut and starter terminal lower cover.
(f) Remove the flywheel housing side cover.
Installation
1UR-FSE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the flywheel housing side cover.
(b) Install the terminal lower cover with the nut.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Install the starter with the 2 bolts.
Torque: 37 Nm (377 kgf-cm, 27 ft-lbf)