GX 470 V8-4.7L (2UZ-FE) (2004)
h. Reinstall the camshafts (LH Bank).
i.
Reinstall the camshafts (RH Bank).
j.
Reinstall the timing belt.
k. Recheck the valve clearance.
15. INSTALL CYLINDER HEAD COVER SUB-ASSY LH
16. INSTALL CYLINDER HEAD COVER SUB-ASSY
17. INSTALL TIMING CHAIN OR BELT COVER NO.2
18. INSTALL TIMING BELT COVER SUB-ASSY NO.3 LH
19. INSTALL OIL COOLER PIPE
20. INSTALL FAN AND GENERATOR V BELT
21. INSTALL RADIATOR SUPPORT SEAL UPPER
22. INSTALL AIR CLEANER HOSE ASSY
23. INSTALL V-BANK COVER SUB-ASSY
24. ADD ENGINE COOLANT