GX 470 V8-4.7L (2UZ-FE) (2004)
B.
Install the bolt, the 2 screws, and the nut.
Bolt Torque: 9.8 N.m (100 kgf.cm, 87 in.lbf)
Nut Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
CAUTION:
^
NOT reuse the broken bolts
^
Be sure to install hardware to secure the air box.
C.
Install the 7 clamps and connect the connectors.
NOTE:
Be sure to connect all connectors.
5.
Install the 3 claws and install the air duct No.2.
HINT:
For easy installation, engage the upper claws first.