GX 470 V8-4.7L (2UZ-FE) (2004)
b. Align the left end of the marking tape and the connected part of the accumulator pressure sensor, and install 2 new clamps.
NOTICE: The left end of the marking tape should be positioned within 5 mm (0.20 inch) from the connected part of the accumulator
pressure sensor.
28. INSTALL STABILIZER CONTROL W/BRACKET VALVE ASSY
a. Insert the protrusion on the stabilizer bracket into the frame, and install the stabilizer control w/ bracket valve assy with the 9 bolts.
Torque: 29 Nm (296 kgf-cm, 21 ft. lbs.)
b. Connect the 2 connectors.
29. INSTALL FRONT STABILIZER CONTROL TUBE NO.1 AND NO.2
a. Install the front stabilizer control tube No.1 and No.2.
1. Apply suspension fluid to the threads of the flare nuts.
2. Temporarily tighten the 6 flare nuts on the front stabilizer control tube No.1 and No.2.
NOTICE:
^ Do not bend the control tubes.
^ Ensure that the control tubes do not contact other parts.
^ Do not damage the control tubes and flare nuts.
b. Install the 4 bolts.
Torque: 29 Nm (296 kgf-cm, 21 ft. lbs.)