IS 250 AWD V6-2.5L (4GR-FSE) (2006)
17. INSTALL FRONT WIPER ARM HEAD CAP
18. INSTALL ROOF DRIP SIDE FINISH MOULDING LH
19. INSTALL ROOF DRIP SIDE FINISH MOULDING RH
20. INSTALL FRONT UPPER FENDER PROTECTOR LH
21. INSTALL FRONT UPPER FENDER PROTECTOR RH
HINT: Installation procedure of the RH side is the same as that of the LH side.
22. INSTALL V-BANK COVER SUB-ASSEMBLY
23. INSTALL ENGINE ROOM SIDE COVER LH
24. INSTALL ENGINE ROOM SIDE COVER RH
25. INSTALL COOL AIR INTAKE DUCT SEAL
26. CHECK FUNCTION OF THROTTLE WITH MOTOR BODY ASSEMBLY
27. PERFORM INITIALIZATION
a. Perform initialization, See: Computers and Control Systems/Testing and Inspection/Programming and Relearning.
HINT: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.