IS 250 AWD V6-2.5L (4GR-FSE) (2006)
8. INSTALL BATTERY TRAY
a. Install the battery tray with the 2 bolts.
Torque: 5.0 N.m (51 kgf.cm, 44 in.lbf)
9. INSTALL POWER STEERING ECT ASSEMBLY
10. INSTALL BATTERY
11. INSTALL FRONT EXHAUST PIPE ASSEMBLY
12. INSTALL HEATED OXYGEN SENSOR (for 2WD)
13. INSTALL HEATED OXYGEN SENSOR (for 4WD)
14. INSTALL FRONT CENTER FLOOR BRACE
15. INSTALL REAR NO. 1 FLOOR PANEL BRACE
16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
17. PERFORM INITIALIZATION
a. Perform initialization, See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Programming and Relearning.
NOTE: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.
18. INSTALL ENGINE ROOM SIDE COVER LH
19. INSTALL ENGINE ROOM COVER SIDE RH
20. INSTALL COOL AIR INTAKE DUCT SEAL
21. EXHAUST GAS LEAKAGE