IS 250 RWD V6-2.5L (4GR-FSE) (2007)
Parts Information
Required Tools & Equipment
Repair Procedure
1. Remove the existing auxiliary port terminal from the vehicle.
Parts Information
Required Tools & Equipment
Repair Procedure
1. Remove the existing auxiliary port terminal from the vehicle.