IS 250 RWD V6-2.5L (4GR-FSE) (2007)
c. Connect the roof wire connector and engage each clamp.
d. Connect each connector to the map light assembly.
13. INSTALL ROOF HEADLINING ASSEMBLY (w/ Sliding Roof)
a. Place the roof headlining in the vehicle from the front right door.
b. Engage the hook, 10 claws, 8 fasteners and 2 clips, and install the roof headlining assembly.