IS 250 RWD V6-2.5L (4GR-FSE) (2007)
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 2 Exhaust Side)
a. Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
b. Install the camshaft timing oil control valve with the bolt.
Torque:10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE: Be careful that the O-ring is not cracked or jumped when installing the oil control valve.
c. Connect the camshaft timing oil control valve connector.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Intake Side)
a. Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
b. Install the camshaft timing oil control valve with the bolt.
Torque:10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE: Be careful that the O-ring is not cracked or jumped when installing the oil control valve.
c. Connect the camshaft timing oil control valve connector.