IS 250 RWD V6-2.5L (4GR-FSE) (2007)
1. INSTALL BLOWER ASSEMBLY
a. Install the blower assembly with the claw and screw.
Torque: 3.0 N.m (31 kgf.cm, 27 in.lbf)
b. Connect the connector.
2. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
3. INSTALL NO.2 AIR DUCT
a. Install the No.2 air duct with the screw.
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
4. INSTALL AIR CONDITIONER UNIT ASSEMBLY
a. Install the air conditioner unit assembly with the 3 bolts and 2 screws.
Torque: 9.8 N.m (100 kgf.cm, 7 ft.lbf) (bolt 1)