IS 250 RWD V6-2.5L (4GR-FSE) (2007)
76. PERFORM INITIALIZATION
NOTE: Some systems need initialization after reconnecting the cable to the negative battery terminal
77. CHARGE REFRIGERANT
78. WARM UP ENGINE
79. CHECK FOR LEAKAGE OF REFRIGERANT
80. INSTALL ENGINE ROOM SIDE COVER LH
81. INSTALL ENGINE ROOM SIDE COVER RH
82. INSTALL COOL AIR INTAKE DUCT SEAL