IS 250 RWD V6-2.5L (4GR-FSE) (2007)
b. Install the front height control sensor sub-assembly with the nut.
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
c. Connect the connector.
4. VEHICLE PREPARATION FOR HEADLIGHT AIM ADJUSTMENT
5. PREPARATION FOR HEADLIGHT AIMING (Using a tester)
6. PREPARATION FOR HEADLIGHT AIMING (Using a screen)
7. HEADLIGHT AIMING INSPECTION
8. HEADLIGHT AIMING ADJUSTMENT