IS 250 RWD V6-2.5L (4GR-FSE) (2007)
i)
Install the transmission control shaft lever RH with the nut.
Torque: 16 Nm (163 kgf-cm, 12 ft. lbs.)
f) Connect the park/neutral position switch connector.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUBASSEMBLY
3. ADJUST SHIFT LEVER POSITION
4. INSPECT SHIFT LEVER POSITION
5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY