IS 250 RWD V6-2.5L (4GR-FSE) (2007)
c. Connect the MAF meter connector.
2. INSTALL ENGINE ROOM SIDE COVER RH
3. INSTALL COOL AIR INTAKE DUCT SEAL
c. Connect the MAF meter connector.
2. INSTALL ENGINE ROOM SIDE COVER RH
3. INSTALL COOL AIR INTAKE DUCT SEAL