IS 250 RWD V6-2.5L (4GR-FSE) (2007)
4. INSTALL NO. 2 VENTILATION HOSE
a. Connect the ventilation hose to the cylinder head cover with the clamp.
5. INSTALL ENGINE ROOM SIDE COVER LH
6. INSTALL ENGINE ROOM SIDE COVER RH
7. INSTALL COOL AIR INTAKE DUCT SEAL
8. INSTALL V-BANK COVER SUB-ASSEMBLY
9. CONNECT BATTERY NEGATIVE TERMINAL
10. PERFORM INITIALIZATION
a. Perform initialization, See: Computers and Control Systems/Testing and Inspection/Programming and Relearning.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.