IS 250 RWD V6-2.5L (4GR-FSE) (2007)
HINT:
-
Align positioning boss (A) of the blower assembly with the hole of the skid control ECU.
-
Securely engage the hook (B) of the skid control ECU with the blower assembly.
b. Connect the 3 connectors to the skid control ECU.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
3. CHECK AND CLEAR DTC