IS 250 RWD V6-2.5L (4GR-FSE) (2007)
d. Install the generator wire to terminal B with the nut (A).
Torque: 9.8 N.m (100 kgf.cm, 87 in.lbf)
e. Install the terminal cap.
f.
Install the clamp bracket with the bolt (B).
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
g. Attach the 2 clamps, and connect the generator connector to the generator.
2. INSTALL WIRE HARNESS
a. Install the wire harness with the 3 nuts (A).
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
b. Connect the 2 connectors (B).
3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
4. INSTALL NO. 2 ENGINE COVER
5. INSTALL RADIATOR INLET HOSE
6. INSTALL V-RIBBED BELT
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
8. ADD ENGINE COOLANT
9. CHECK FOR ENGINE COOLANT LEAKS
10. INSTALL NO. 1 INLET AIR CLEANER
11. INSTALL V-BANK COVER SUB-ASSEMBLY
12. INSTALL ENGINE ROOM SIDE COVER LH
13. INSTALL COOL AIR INTAKE DUCT SEAL
14. PERFORM INITIALIZATION
a. Perform initialization
NOTE: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.