IS 250 RWD V6-2.5L (4GR-FSE) (2007)
1. INSTALL FRONT AXLE HUB SUB-ASSEMBLY (for 2WD)
a) Install the front axle hub sub-assembly and front disc brake dust cover with the 4 bolts.
Torque: 69 Nm (702 kgf-cm, 51 ft. lbs.)
2. INSTALL FRONT AXLE HUB SUB-ASSEMBLY (for 4WD)
a) Install the front drive shaft assembly to the front axle hub sub-assembly
b) Install the front axle hub sub-assembly and front disc brake dust cover with the 4 bolts.
Torque: 69 Nm (702 kgf-cm, 51 ft. lbs.)
NOTICE: Be careful not to damage the front drive shaft boot.
3. INSTALL FRONT AXLE HUB NUT (for 4WD)
a) Using the socket wrench (30 mm), install a new front axle hub nut.
Torque: 294 Nm (2,998 kgf-cm, 217 ft. lbs.)
HINT: Stake the nut after inspecting for looseness and runout in the following steps.
4. INSPECT FRONT AXLE HUB BEARING FOR LOOSENESS
5. INSPECT FRONT AXLE HUB FOR RUNOUT
6. INSTALL FRONT DISC
7. INSTALL FRONT DISC BRAKE CALIPER ASSEMBLY (for 2WD)