IS 250 RWD V6-2.5L (4GR-FSE) (2007)
a) Remove the shift solenoid valve S1.
7. REMOVE SHIFT SOLENOID VALVE S4
a) Remove the bolt and the shift solenoid valve S4.
8. REMOVE SHIFT SOLENOID VALVE S2
a) Remove the shift solenoid valve S2.
9. REMOVE SHIFT SOLENOID VALVE S3
a) Remove the bolt and the shift solenoid valve S3.
REASSEMBLY
1. INSTALL SHIFT SOLENOID VALVE S3