IS 250 RWD V6-2.5L (4GR-FSE) (2007)
b) Remove the bolt and pull out the transmission wire.
c) Remove the O-ring from the transmission wire.
INSPECTION
1. INSPECT TRANSMISSION WIRE
Transmission Wire (Connector Front View)
a) Using an ohmmeter, measure the resistance between the terminals.
Standard Resistance
If the resistance value is not as specified, replace the transmission wire.
INSTALLATION
1. INSTALL TRANSMISSION WIRE
a) Coat a new O-ring with ATF and install it to the transmission wire.