IS 250 RWD V6-2.5L (4GR-FSE) (2007)
c) Using SST to hold the universal joint flange, remove the nut and intermediate shaft washer.
SST 09330-00021
d) Put matchmarks on the intermediate shaft assembly and universal joint flange.
e) Using SST, remove the universal joint flange from the intermediate shaft assembly
SST 09950-00020, 09950-00030, 09330-00021
NOTICE: Apply grease to the threads and tip of the SST center bolt before use.
f) Remove the No.1 center support bearing assembly and 2 center support bearing washers from the intermediate shaft assembly.
INSPECTION
1. INSPECT PROPELLER SHAFT ASSEMBLY
a) Using a dial indicator, inspect the runout of the propeller shaft.
Maximum runout: 0.8 mm (0.031 inch)
NOTICE: The dial indicator must be set perpendicular to the center of the propeller shaft.
HINT: If the shaft runout exceeds the maximum, replace the propeller shaft.
2. INSPECT INTERMEDIATE SHAFT