IS 250C V6-2.5L (4GR-FSE) (2011)
Convertible Top Control Module: Service and Repair
Installation
SLIDING ROOF / CONVERTIBLE: METAL TOP ROOF CONTROL COMPUTER: INSTALLATION
1. INSTALL SLIDING ROOF CONTROL ECU ASSEMBLY
(a) Install the sliding roof control ECU assembly with the 2 nuts and bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect each connector.
2. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER See: Roof and Associated Components/Convertible Top/Service and
Repair/Removal and Replacement/Installation
3. INSTALL SLIDING ROOF GUIDE RAIL STOPPER See: Roof and Associated Components/Convertible Top/Service and Repair/Removal and
Replacement/Installation
4. INSTALL TONNEAU COVER HOOK HOLDER See: Roof and Associated Components/Convertible Top/Service and Repair/Removal and
Replacement/Installation
5. INSTALL TONNEAU COVER ASSEMBLY See: Roof and Associated Components/Convertible Top/Service and Repair/Removal and
Replacement/Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. INSPECT SRS WARNING LIGHT
See: Restraint Systems/Air Bag Systems/Testing and Inspection/Initial Inspection and Diagnostic Overview/Diagnosis System
8. INSPECT RETRACTABLE HARDTOP SYSTEM See: Roof and Associated Components/Convertible Top/Service and Repair/Removal and
Replacement/Installation