IS 250C V6-2.5L (4GR-FSE) (2011)
Canister Purge Control Valve: Service and Repair
Removal
4GR-FSE EMISSION CONTROL: PURGE VALVE: REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Removal
2. REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
(a) Disconnect the connector and 2 fuel vapor feed hoses.
(b) Remove the bolt and No. 1 vacuum switching valve assembly.