IS 250C V6-2.5L (4GR-FSE) (2011)
11. REMOVE FRONT NO. 1 FLOOR HEAT INSULATOR See: Drive/Propeller Shafts, Bearings and Joints/Drive/Propeller Shaft/Service and
Repair/Removal and Replacement/Removal
12. SEPARATE FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Remove the nut and separate the floor shift gear shifting rod sub-assembly.
13. REMOVE TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Disconnect the 2 connectors and 4 clamps.
(b) Remove the 4 bolts and transmission floor shift assembly.
Installation
A760E AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the transmission floor shift assembly with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the 2 connectors and 4 clamps to the floor shift assembly.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Install the floor shift gear shifting rod sub-assembly with the nut.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
3. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR See: Drive/Propeller Shafts, Bearings and Joints/Drive/Propeller Shaft/Service and
Repair/Removal and Replacement/Installation