IS 250C V6-2.5L (4GR-FSE) (2011)
HINT
Estimate the correct adjustment of the glass by comparing it to the profile of the roof weatherstrip.
(7) Tighten the 3 nuts while holding the glass in position.
(8) Connect the positive (+) lead of a battery to terminal 1, and the negative (-) lead to terminal 2 of the power window regulator motor
assembly to move the lift arm to the position shown in the illustration.
NOTICE:
*
If the glass is moved too high, the roof weatherstrip may be damaged.
*
Do not damage the quarter window glass.
HINT
*
Determine the fully closed position by referring to the measurements for areas C and E, and F and H in the Glass Target Position
diagram.
*
Double check the measurement for area A in the Glass Target Position diagram at this time. If area A requires adjustment, return
to step A.
(9) Loosen the 2 quarter window stop installation bolts.
(10)While lightly pushing the quarter window stops toward the quarter window regulator assembly, tighten the 2 bolts.
(f) Connect the cable to the negative (-) battery terminal and the power window regulator motor connector.
(g) Initialize power window control system.
See: Testing and Inspection/Programming and Relearning/Initialization
(h) Open the metal top roof.
See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Removal and Replacement/Roof Headlining (for Front
Side)/Removal
(i) Disconnect the cable from the negative (-) battery terminal.
NOTICE:
After the engine switch is turned off, the display and navigation module display (HDD navigation system) records various types of
memory and settings. As a result, after turning the engine switch off, make sure to wait at least 60 seconds before disconnecting the
cable from the negative (-) battery terminal See: Accessories and Optional Equipment/Navigation System/Service Precautions.
(j) Disconnect the power window regulator motor connector.
15. INSTALL QUARTER SERVICE HOLE COVER
(a) Engage the grommet.