lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Component Inspection|Page 2425 > < Component Inspection|Page 2423
Page 5
background image

c. Connect the camshaft timing oil control valve connector.
d. Install the V-bank cover bracket with the bolt.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Exhaust Side)

a. Apply a light coat of engine oil to a new O-ring and install it to the oil control valve.
b. Install the oil control valve with the bolt.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

NOTE:  Be careful that the O-ring is not cracked or jumped when installing the oil control valve.

c. Connect the camshaft timing oil control valve connector.

5. INSTALL INTAKE AIR SURGE TANK
6. INSTALL THROTTLE BODY
7. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
8. CONNECT NO. 2 VENTILATION HOSE
9. ADD ENGINE COOLANT

10. CHECK FOR ENGINE COOLANT LEAKS
11. INSTALL COWL TOP VENTILATOR LOUVER SUBASSEMBLY
12. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY RH
13. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY LH
14. INSTALL FRONT WIPER ARM HEAD CAP
15. INSTALL ROOF DRIP SIDE FINISH MOULDING RH
16. INSTALL ROOF DRIP SIDE FINISH MOULDING LH
17. INSTALL FRONT FENDER PROTECTOR UPPER RH
18. INSTALL FRONT FENDER PROTECTOR UPPER LH

Component Inspection|Page 2425 > < Component Inspection|Page 2423