IS 350 V6-3.5L (2GR-FSE) (2006)
a. Install the blower assembly with the claw and screw.
Torque: 3.0 N.m (31 kgf.cm, 27 in.lbf)
b. Connect the connector.
2. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
3. INSTALL NO. 2 AIR DUCT
a. Install the No. 2 air duct with the screw.
Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf)
4. INSTALL AIR CONDITIONER UNIT ASSEMBLY
a. Install the air conditioner unit assembly with the 3 bolts and 2 screws.
Torque: 9. 8 N.m (100 kgf.cm, 7 ft.lbf) (bolt 1)
5. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY