IS 350 V6-3.5L (2GR-FSE) (2006)
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 2 Intake Side)
a. Apply a light coat of engine oil to a new O-ring and install it to the oil control valve.
b. Install the oil control valve with the bolt.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE: Be careful that the O-ring is not cracked or jumped when installing the oil control valve.
c. Connect the camshaft timing oil control valve connector.
d. Install the bracket with the bolt.
Torque: 10 N.m (104 kgf.cm, 7 ft.lbf)
e. Connect the wiring harness at the bracket.