IS 350 V6-3.5L (2GR-FSE) (2006)
b. Remove the 3 screws and skid control ECU.
INSTALLATION
1. INSTALL SKID CONTROL ECU
a. Install the skid control ECU with the 3 screws.
Torque: 4.8 Nm (49 kgf-cm, 42 inch lbs.)
HINT:
^
Align positioning boss (A) of the blower assembly with the hole of the skid control ECU.
^
Securely engage the hook (B) of the skid control ECU with the blower assembly.
b. Connect the 3 connectors to the skid control ECU.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
3. CHECK AND CLEAR DTC