IS F V8-5.0L (2UR-GSE) (2008)
and Repair/Installation
10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Installation
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.
12. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION
HINT: See: Acceleration/Deceleration Sensor/Testing and Inspection.
13. CHECK FOR SENSOR SIGNAL
HINT: See: Testing and Inspection/Initial Inspection and Diagnostic Overview/Test Mode Procedure.