IS F V8-5.0L (2UR-GSE) (2008)
(a) Install the cooler condenser assembly with the 4 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
5. CONNECT OIL COOLER HOSE
(a) Install the oil cooler pipe with the 2 bolts.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the 2 oil cooler hoses to the radiator assembly.
6. CONNECT NO. 2 RADIATOR HOSE
(a) Connect the No. 2 radiator hose to the radiator assembly.
7. CONNECT NO. 1 RADIATOR HOSE
(a) Connect the No. 1 radiator hose to the radiator assembly.
8. INSTALL UPPER RADIATOR SUPPORT
(a) Install the 5 bolts and the upper radiator support.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)