IS F V8-5.0L (2UR-GSE) (2008)
12. REMOVE CYLINDER HEAD SUB-ASSEMBLY (for Bank 2)
(a) Remove the 3 bolts and camshaft housing.
(b) Uniformly loosen and remove the 2 bolts in the sequence shown in the illustration.
(c) Using a 10 mm bi-hexagon wrench, uniformly loosen the 10 bolts in the sequence shown in the illustration. Remove the 10 cylinder head bolts
and plate washers.
NOTICE:
-
Be careful not to drop washers into the cylinder head.
-
Head warpage or cracking could result from removing the bolts in an incorrect order.
HINT: Be sure to keep the removed parts separate for each installation position.
(d) Remove the cylinder head.
13. REMOVE CYLINDER HEAD GASKET (for Bank 2)
(a) Remove the cylinder head gasket.