IS F V8-5.0L (2UR-GSE) (2008)
(a) Install the ECM cover with the 3 bolts.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)
3. INSTALL ENGINE ROOM SIDE COVER LH See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
4. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.
7. PERFORM INITIALIZATION
(a) When replacing the ECM, some systems need to be initialized.
-
Cruise control system See: Cruise Control/Cruise Control Module/Service and Repair/Installation
-
Engine control system See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation
8. PERFORM RESET MEMORY
NOTICE: Perform RESET MEMORY (AT initialization) when replacing the ECM See: Transmission Control Systems/Testing and
Inspection/Programming and Relearning/Initialization.
HINT: Initialization cannot be completed by only disconnecting and reconnecting the cable to the negative (-) battery terminal.
9. PERFORM REGISTRATION
NOTICE: Perform Registration (VIN registration) when replacing the ECM See: Testing and Inspection/Programming and Relearning.
HINT: Initialization cannot be completed by only disconnecting and reconnecting the cable to the negative (-) battery terminal.