lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Integration Relay|Page 3317 > < Integration Relay|Page 3315
Page 1
background image

Main Relay (Computer/Fuel System): Testing and Inspection
Relay

2UR-GSE ENGINE CONTROL: RELAY: ON-VEHICLE INSPECTION

2UR-GSE ENGINE CONTROL: RELAY: ON-VEHICLE INSPECTION

1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:  Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.
NOTICE:
 When disconnecting the cable, some systems need to be initialized after the cable is reconnected  See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.

2. REMOVE COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine

Assembly/Removal

                 

3. REMOVE ENGINE ROOM SIDE COVER LH See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine

Assembly/Removal

                 

4. REMOVE NO. 2 RELAY BLOCK COVER
5. INSPECT IG2 RELAY

(a) Remove the IG2 relay from the No. 2 relay block.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

If the result is not as specified, replace the relay.

6. INSPECT VVT LH RELAY

(a) Remove the VVT LH relay from the No. 2 relay block.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

If the result is not as specified, replace the relay.

Integration Relay|Page 3317 > < Integration Relay|Page 3315