lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Evaporative Emission Control Canister > < Components|Page 3605
Page 1
background image

Canister Purge Control Valve: Service and Repair
Installation

2UR-GSE EMISSION CONTROL: PURGE VALVE: INSTALLATION

2UR-GSE EMISSION CONTROL: PURGE VALVE: INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

HINT: The No. 1 vacuum switching valve assembly is the purge valve.

(a) Install the No. 1 vacuum switching valve assembly with the bolt.

Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)

(b) Connect the fuel vapor feed hose and No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.
(c) Connect the No. 1 vacuum switching valve assembly connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine

Assembly/Installation

                 

Evaporative Emission Control Canister > < Components|Page 3605