lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Camshaft Oil Control Valve|Page 2739 > < Camshaft Oil Control Valve|Page 2737
Page 3
background image

After the engine switch is turned off, the HDD navigation system requires approximately 6 minutes to record various types of memory
and settings. As a result, after turning the engine switch off, wait 6 minutes or more before disconnecting the cable from the negative
(-) battery terminal.

3. REMOVE V-BANK COVER SUB-ASSEMBLY   See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and

Repair/Removal

4. REMOVE AIR CLEANER INLET COVER SUB-ASSEMBLY   See: Powertrain Management/Fuel Delivery and Air Induction/Throttle

Body/Service and Repair/Removal

5. REMOVE NO. 1 AIR CLEANER INLET   See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and

Repair/Removal

6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)

(a) Disconnect the camshaft timing oil control valve connector.

(b) Remove the bolt and camshaft timing oil control valve.

(c) Remove the O-ring from the camshaft timing oil control valve.

7. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)

(a) Disconnect the camshaft timing oil control valve connector.

(b) Remove the bolt and camshaft timing oil control valve.

(c) Remove the O-ring from the camshaft timing oil control valve.

Installation

1UR-FSE ENGINE CONTROL SYSTEM: CAMSHAFT OIL CONTROL VALVE: INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)

(a) Apply a light coat of engine oil to a new O-ring, and install it to the camshaft timing oil control valve.

(b) Install the camshaft timing oil control valve with the bolt.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

Camshaft Oil Control Valve|Page 2739 > < Camshaft Oil Control Valve|Page 2737