LX 450 L6-4.5L (1FZ-FE) (1996)
c. Torque the union.
Torque: 69 Nm (51 ft. lbs.)
12. Install vane pump drive gear.
a. Install the woodruff key and gear.
b. Using soft. jaws on a vise, clamp the gear in the vise.
NOTICE: Be careful not to damage the gear.
c. Torque the gear set nut.
Torque: 74 Nm (54 ft. lbs.)
13. Measure power steering pump rotating torque.
14. Install suction port union.
a. Coat a new O-ring with power steering fluid and install it to the union.
b. Torque the bolt.
Torque: 13 Nm (9 ft. lbs.)