LX 570 V8-5.7L (3UR-FE) (2010)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
*
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
*
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.
(d) Connect the oil control valve connector.
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
(a) Install a new O-ring to the oil control valve.
(b) Apply a light coat of engine oil to the O-ring.
(c) Install the oil control valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
*
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
*
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.
(d) Connect the oil control valve connector.
5. INSTALL AIR CLEANER HOSE ASSEMBLY See: Intake Manifold/Service and Repair/Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY See: Service and Repair/Engine Assembly/Installation
7. INSTALL UPPER RADIATOR SUPPORT SEAL See: Body and Frame/Grille/Service and Repair/Removal and Replacement/Installation
8. INSTALL ENGINE ROOM SIDE COVER RH See: Body and Frame/Grille/Service and Repair/Removal and Replacement/Installation
9. INSTALL ENGINE ROOM SIDE COVER LH See: Body and Frame/Grille/Service and Repair/Removal and Replacement/Installation