lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 2393 > < Diagram Information and Instructions|Page 2391
Page 1
background image

Variable Valve Timing Actuator: Testing and Inspection

INSPECT OIL CONTROL VALVE RESISTANCE

a. Remove the V-bank cover.
b. Remove the intake air connector.
c. Disconnect the oil control valve connector.
d. Using an Ohmmeter, measure the resistance between the terminals.

Resistance:
6.9 - 7.9 Ohm at 20°C (68°F)
If the resistance is not as specified, replace the valve.

e. Reconnect the oil control valve connector.
f.

Reinstall the intake air connector.

g. Reinstall the V-bank cover.

INSPECT OIL CONTROL VALVE OPERATION

Connect positive (+) lead to terminal 1 of connector and negative 9 lead to terminal 2, then check the movement of the valve.

If operation is not as specified, replace the oil control valve.

Diagram Information and Instructions|Page 2393 > < Diagram Information and Instructions|Page 2391