RX 350 FWD V6-3.5L (2GR-FE) (2010)
Variable Valve Timing Actuator: Service and Repair
Installation
Up to 08/2009
2GR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Apply a light coat of engine oil to 4 new O-rings and install them to the 4 camshaft timing oil control valve assemblies.
Text in Illustration
(b) Install the 4 oil control valves with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
Make sure that each O-ring is not cracked or does not jump out of position during installation.
(c) Connect the 4 oil control valve connectors.
(d) Install the bolt and connect the wire harness clamp to install the engine wire.
Torque : 14 Nm (138 kgf-cm, 10 ft-lbf)
2. INSTALL INTAKE AIR SURGE TANK ASSEMBLY See: Intake Manifold/Service and Repair/Installation
3. INSTALL AIR CLEANER ASSEMBLY See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and
Repair/Installation
4. INSTALL NO. 1 AIR CLEANER INLET See: Service and Repair/Removal and Replacement/Engine Assembly/Installation
5. INSTALL NO. 2 AIR CLEANER INLET See: Service and Repair/Removal and Replacement/Engine Assembly/Installation