lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Components|Page 2863 > < Components|Page 2861
Page 1
background image

Variable Valve Timing Actuator: Service and Repair
Installation

Up to 08/2009

2GR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

(a) Apply a light coat of engine oil to 4 new O-rings and install them to the 4 camshaft timing oil control valve assemblies.

Text in Illustration

(b) Install the 4 oil control valves with the 4 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

NOTICE:
Make sure that each O-ring is not cracked or does not jump out of position during installation.

(c) Connect the 4 oil control valve connectors.

(d) Install the bolt and connect the wire harness clamp to install the engine wire.

Torque : 14 Nm (138 kgf-cm, 10 ft-lbf)

2. INSTALL INTAKE AIR SURGE TANK ASSEMBLY   See: Intake Manifold/Service and Repair/Installation

3. INSTALL AIR CLEANER ASSEMBLY   See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and

Repair/Installation

4. INSTALL NO. 1 AIR CLEANER INLET   See: Service and Repair/Removal and Replacement/Engine Assembly/Installation

5. INSTALL NO. 2 AIR CLEANER INLET   See: Service and Repair/Removal and Replacement/Engine Assembly/Installation

Components|Page 2863 > < Components|Page 2861