RX 350 FWD V6-3.5L (2GR-FE) (2010)
4. CONNECT AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY
(a) Remove the attached vinyl tape from the pipe and the connecting part of the cooler condenser assembly.
(b) Sufficiently apply compressor oil to a new O-ring and the fitting surface of the pipe joint.
Compressor oil:
ND-OIL 8 or equivalent
(c) Install the O-ring on the air conditioning tube and accessory assembly.
NOTICE:
Keep the O-ring and O-ring fitting surfaces clean from dirt or any foreign objects.
(d) Install the air conditioning tube and accessory assembly on the cooler condenser assembly with the bolt.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
5. INSTALL NO. 1 AIR CLEANER INLET See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
6. INSTALL NO. 2 AIR CLEANER INLET See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
7. INSTALL HOOD LOCK SUPPORT SUB-ASSEMBLY
(a) Install the hood lock support sub-assembly with the 2 bolts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Engage each clamp.
8. INSTALL SMOG VENTILATION SENSOR (w/ Smog Ventilation Sensor) See: Climate Control Exhaust Gas Sensor/Service and
Repair/Installation
9. INSTALL HIGH PITCHED HORN ASSEMBLY See: Lighting and Horns/Horn/Service and Repair/High Pitched Horn/Installation
10. INSTALL HOOD LOCK ASSEMBLY See: Body and Frame/Doors, Hood and Trunk/Hood/Hood Latch Release Cable/Service and
Repair/Installation
11. INSTALL HOOD LOCK CONTROL CABLE COVER See: Body and Frame/Doors, Hood and Trunk/Hood/Hood Latch Release Cable/Service
and Repair/Installation