RX 350 FWD V6-3.5L (2GR-FE) (2010)
(a) Inspect the suspension control system See: Steering and Suspension/Suspension/Testing and Inspection/Component Tests and General
Diagnostics/Air Suspension System/Test Mode Procedure.
116. INSPECT SRS WARNING LIGHT
(a) Inspect the SRS warning light See: Restraint Systems/Air Bag Systems/Testing and Inspection/Initial Inspection and Diagnostic
Overview/Diagnosis System.
From 08/2009
HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT: INSTALLATION
1. INSTALL AIR CONDITIONING UNIT ASSEMBLY
(a) Install the air conditioning unit assembly with the 3 bolts in the order shown in the illustration.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
NOTICE:
Tighten the bolts in the order shown in the illustration to install the air conditioning unit assembly.
2. INSTALL NO. 1 AIR DUCT SUB-ASSEMBLY
(a) Engage the 4 claws to install the No. 1 air duct sub-assembly.
3. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONING UNIT ASSEMBLY
(a) Using a "TORX" socket wrench (T40), install the instrument panel reinforcement assembly with the 5 "TORX" bolts in the order shown in the
illustration.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
NOTICE:
Tighten the bolts in the order shown in the illustration to install the reinforcement assembly.
(b) Install the 5 instrument panel safety pad caps.