lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 4389 > < Initial Inspection and Diagnostic Overview|Page 4387
Page 7
background image

NG --  CHECK FOR OPEN IN CAN BUS WIRE (CAN NO. 2 J/C)

OK --  REPLACE CAN NO. 1 JUNCTION CONNECTOR

6. CHECK FOR OPEN IN CAN BUS WIRE (CAN NO. 2 J/C)

(a) Reconnect the CAN No. 1 junction connector.

(b) Disconnect the CAN No. 2 junction connector.

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Text in Illustration

Result:

C --  REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CAN NO. 1 J/C - CAN NO. 2 J/C)

B --  REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CAN NO. 2 J/C - CERTIFICATION ECU)

A --  REPLACE CAN NO. 2 JUNCTION CONNECTOR

From 08/2009

NETWORKING: CAN COMMUNICATION SYSTEM: Open in CAN Main Bus Line
 - Open in CAN Main Bus Line

DESCRIPTION

There may be an open circuit in the CAN bus main wire and/or the DLC3 branch wire when the resistance between terminals 6 (CANH) and 14 (CANL)
of the DLC3 is 70 Ohms or higher.

Initial Inspection and Diagnostic Overview|Page 4389 > < Initial Inspection and Diagnostic Overview|Page 4387