RX 350 FWD V6-3.5L (2GR-FE) (2010)
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
Text in Illustration
(c) Reinstall the IG2 relay.
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (IG2 RELAY - BODY GROUND)
OK -- Continue to next step.
11. CHECK HARNESS AND CONNECTOR (IG2 RELAY - POWER MANAGEMENT CONTROL ECU)
(a) Disconnect the power management control ECU connector.
(b) Remove the IG2 relay from the engine room relay block.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
Standard Resistance (Check for Short):
Text in Illustration