RX 350 FWD V6-3.5L (2GR-FE) (2010)
Canister Purge Control Valve: Service and Repair
Installation
Up to 08/2009
2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE
(a) Install the No. 1 vacuum switching valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve.
(c) Connect the wire harness clamp.
(d) Connect the No. 1 vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL See: Body and Frame/Bumper/Front Bumper/Service and Repair/Removal and
Replacement/Installation
4. INSTALL ENGINE ROOM SIDE COVER See: Body and Frame/Bumper/Front Bumper/Service and Repair/Removal and
Replacement/Installation
5. INSTALL ENGINE ROOM SIDE COVER LH See: Body and Frame/Bumper/Front Bumper/Service and Repair/Removal and
Replacement/Installation
From 08/2009
2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE
(a) Install the No. 1 vacuum switching valve with the bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve.