lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Components|Page 721 > < Components|Page 719
Page 1
background image

Engine Control Module: Service and Repair
Installation

Up to 08/2009

2GR-FE ENGINE CONTROL: ECM: INSTALLATION

1. INSTALL ECM

(a) Install the 2 brackets to the ECM with the 5 screws.

Text in Illustration

(b) Install the ECM with bracket with the 3 bolts.

Torque : 8.0 Nm (82 kgf-cm, 70 in-lbf)

(c) Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
*

When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors
and other part.

*

Make sure that the 2 levers are securely locked.

(d) Install the wire harness clamp.

(e) Install the wire harness clamp.

2. INSTALL AIR CLEANER ASSEMBLY   See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and

Repair/Installation

3. INSTALL BATTERY   See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine Assembly/Installation

4. INSTALL NO. 1 AIR CLEANER INLET   See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine

Assembly/Installation

Components|Page 721 > < Components|Page 719