RX 350 FWD V6-3.5L (2GR-FE) (2010)
(c) Securely connect the connector to the power steering ECU assembly.
HINT
Return the lock lever to its original position to connect the connector, and then securely push in the lock of the lock lever as shown in
the illustration.
(d) Connect the 3 connectors to the power steering ECU assembly.
2. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
(a) Connect the connectors to the back of the instrument panel junction block assembly.
(b) Install the instrument panel junction block assembly with the 2 nuts.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the connectors to the instrument panel junction block assembly.
3. INSTALL AFS ECU
HINT
Refer to the instructions for Installation of the AFS ECU See: Lighting and Horns/Headlamp/Headlamp Alignment Control
Module/Service and Repair/Installation.
4. INSTALL BRAKE PEDAL SUPPORT SUB-ASSEMBLY
HINT
Refer to the instructions for Installation of the brake pedal support sub-assembly See: Brakes and Traction Control/Brake Pedal
Assy/Service and Repair/Removal and Replacement/Installation.
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.
6. INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT
HINT
See: Testing and Inspection/Programming and Relearning
7. INSPECT FOR SRS WARNING LIGHT