RX 400h AWD V6-3.3L (3MZ-FE) Hybrid (2007)
c. Install the battery carrier duct (LH) with the 2 bolts.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)
14. INSTALL BATTERY CARRIER BRACKET
a. Install the battery carrier bracket with the 2 bolts.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)
15. INSTALL REAR CENTER SEAT INNER BELT ASSEMBLY
16. INSTALL FLOOR CARPET ASSEMBLY FRONT
a. Install the front floor carpet.
17. INSTALL AIR INTAKE COVER CENTER
a. Install the air intake cover with the 2 screws.
b. Install the 2 hole covers.
18. INSTALL AIR INTAKE COVER