lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Hybrid Battery Bus / Cable|Service and Repair|Page 2541 > < Hybrid Battery Bus / Cable|Service and Repair|Page 2539
Page 17
background image

a. Install the No.3 wire frame.

CAUTION:  Wear insulating gloves. 

1. Install the No.3 wire frame with the 5 nuts. (H)

Torque: 8.5 N.m (87 kgf.cm, 75 in.lbf) 

Hybrid Battery Bus / Cable|Service and Repair|Page 2541 > < Hybrid Battery Bus / Cable|Service and Repair|Page 2539